欧美区一区二,夜夜干天天爽,色的综合,国产深夜不卡在线 91

Industry information Installation and working engineering of coal powder sampler源頭廠家規(guī)格參數(shù)
Your location : Home > News > Industry information

Installation and working engineering of coal powder sampler

time:2023-11-25 22:32:14Views:

Installation instructions for mobile coal powder sampler and coal powder sampling device:


The installation and operation of the coal powder sampler and mobile coal powder sampler of Lianyungang Lingdong Electromechanical Equipment Co., Ltd. drill holes on the flue, extend the sampling tube into the flue, and make the sampling head face the direction of the incoming smoke flow. (Depending on the situation, the manufacturer can provide their own anti wear sleeve) Weld the sealing flange to the flue and ensure sealing with the sampling pipe. Connect the sampling tube to the cyclone collector with a nut. Connect the cyclone collector to the outlet pipe and valve, and then connect the sampling system to a certain position behind the baffle plate of the induced draft fan through a conduit (i.e. open a hole here. Weld the conduit). Insulate the sampling system (outside the flue) and the entire collector to prevent condensation from blocking the pipeline after sampling.

1-241110194620F4.webp

1-241110194620F4.webp

1-241110194620F4.webp


Mobile coal powder sampler, coal powder sampling device working process:


After the smoke flow enters the sampling nozzle, it passes through the sampling tube and enters the cyclone separator along the tangential direction of the wall. Rotate upwards and downwards along the wall of the device. During the rotation process, the fly ash is thrown onto the device wall due to inertial force, and falls into the ash collection hopper along the device wall through force, entering the sampling bottle, while the gas is discharged through the outlet pipe. When the flue gas flow rate is within the range of 6m/s-14m/s and the constant velocity sampling rate is greater than 95%, the sampler can also be powered by an air pump and can operate intermittently. Within the range of 70% of the unit load, it has the function of constant velocity adjustment. Reliable operation, convenient operation, and requires human maintenance. Mobile coal powder sampler - generally installed on the flue of the air preheater. If the flue width is greater than 2m, two samplers should be symmetrically installed on the flue. If the width is less than 2m, only one sampler should be installed. The pipe joints used for connection type transition are all equipped with water heating equipment- Some movable joints should be installed between them for easy disassembly and assembly, and welding parts should be minimized as much as possible. Connection welding requirements - closed.


產(chǎn)品動(dòng)態(tài)

Installation and working engineering of coal powder sampler源頭廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

99爱午夜| 极品风骚人妻被舔夜| 天堂淫黄大片| 91精品国产综合久久精品图片| 久久精品国产亚洲精品2020| 色奶头AV| 島國AV线上| 美国三级片久久久久| 人妻精品欧美的| 人人干人人人干免费在线| 精品欧美日韩一区二区三区死区| 淫荡骚妻国产精品欧美一区二区三区| 在线精品91久久电影| 小仙女激情砰砰砰| 久久色青青草| 搞黄视频网站| 日韩精品中文字幕日本精品| 欧美日不卡视频一区二区| 亚州午夜成人| 美国深夜噜噜| 国产综合视频在线91| 91人人妻人人澡人人爽超污 | 男女那个| 成人AV一中文字幕日韩| 激情文学偷拍视频| 殴美特黄特一级| 中文无码3区| 夜夜夜夜夜夜夜夜夜欧美| 玖玖在线视频| 欧美美女久久久久久久久久久久 | 超碰色色在线| www.色妹| 久久久久99精品久久久久| 在线影院 欧美一区| 拳交AV在线观看| 大香蕉久久在线看| 久久激情岛国三级电影综合网| 精品久久AV不卡| 少妇诱惑视频网| 一级床上射精片免费| 国产精品一区二区20P发布久久|